Every batch on your line, accounted for.
Material that matches the record, work in progress that can be located and lots that can be traced back. The right technology is chosen for each station and connected through
DERAS to the ERP or MES already in use.

The everyday gaps
Most production delays start as a missing record.
Different symptoms, one cause: no reliable record of what moved, where and through which step.
16%
of manufacturing leaders monitor work in progress in real time
76%
of automotive companies had problems with returnable containers
ERP: 480 pcs · Floor: 422- ERP says yes, floor says noMaterial counts drift between checks.
- Lines waiting for materialShortages found when the bin is empty.
- Work in progress you can’t findStatus chased by walking the floor.
- Traceability that takes daysPaper and spreadsheets after a complaint.
- Held parts slip back inA sticker is not a hold.
- Returnables that never returnTotes and racks no one counts back.
- Tools and molds out of sightSearched for at every shift start.
- Data in too many placesEvery gap investigated by hand.
From incoming material to finished goods.
in ManufacturingEach roll read is ticked off its PO line, so shortages show.
Receiving screen, PO-2611-007: the RFID handheld reads each roll as the truck unloads; 20 of 20 rolls on their PO lines. Illustrative figures.
Every roll is read again as it leaves the rack, so stock and days of use stay exact.
Fabric store screen: roll RL-0412 Denim issued to WO-118; stock and days of use update as the roll leaves the rack. Illustrative figures.
Cut pieces are logged per bundle; the camera shows idle table time.
Cutting screen, WO-118: 12 of 12 bundles cut on table 1; the camera records table 2 idle for 6 minutes. Illustrative figures.
Bundles are logged per station, so a slow station is spotted early.
Sewing line screen: bundles logged per station; S3 runs slower than the others and is spotted early. Illustrative figures.
Each defect is logged by type and station, with a camera capture as evidence.
QC screen: 24 garments inspected; 2 defects (loose stitching from S3, a stain from S2) logged with camera captures. Illustrative figures.
Each hang tag is a record linked to its carton; the printer unlocks for staff only.
Packing screen: 24 RFID hang tags printed and linked to 2 cartons; the printer unlocks after a face check. Illustrative figures.
The gate checks every carton against the delivery note; then GPS follows the truck.
Dispatch screen, DN-2611-052: the gate reads 24 cartons, matching the delivery note; GPS follows truck TRK-07. Illustrative figures.
Output, work in progress and dispatch update together, so nothing needs chasing.
Summary screen, Plant 1 today: 20 of 20 rolls received, 12 of 12 bundles cut, QC pass rate 98.6%, 24 of 24 cartons dispatched. Illustrative figures.
Technology
RFID handheldBarcode
Technology
RFID handheld
Technology
CCTV · activity
Technology
TabletCCTV
Technology
AI cameraTablet
Technology
RFID printerBarcodeFace recognition
Technology
RFID gateGPS
Technology
All through DERAS
Example flow and illustrative screens. Capture points, technology and integration are confirmed per project after assessment.
What it takes, stage by stage.
- 1Receiving
RFID handheldRolls ticked off the PO - 2Fabric store
RFID roll tagsStock exact, roll by roll - 3Cutting
Activity cameraIdle table time visible - 4SewingSupervisor tabletBundles logged per station
- 5QC & pressing
AI quality cameraEvery defect has a capture - 6Packing
RFID printerEach piece linked to its carton - 7Dispatch
RFID gate and GPSLoads match the delivery note - 8Summary
TUDI app on DERASOne record per step
Every stage also needs
- Network and power on the floor
- RFID tags on rolls and garments
DERAS, linking every stage
How a project runs
- 1Assess
Walk the plant from receiving to dispatch; find where the record breaks.
- 2Design
Choose the device type per stage; barcode where it is enough.
- 3Supply & deploy
Install, tag and test on your real rolls, parts and lines.
- 4Integrate
Connect through DERAS to your WMS or ERP, when you need it.
- 5Pilot & measure
Start with one line or one station, measure against the baseline, then expand.
- 6Support
Training, tuning after go-live, ongoing support.
Start with one workflow
Find where
the line loses track.
Share the parts, the production flow and the systems already in use. The first conversation sets a starting point and the metrics to measure.